{"id":142,"date":"2015-06-12T07:26:34","date_gmt":"2015-06-12T12:26:34","guid":{"rendered":"http:\/\/blog.ligowave.com\/?p=142"},"modified":"2016-04-06T04:15:15","modified_gmt":"2016-04-06T09:15:15","slug":"ligoptp-5-n-pro-link-deployment-in-philippines","status":"publish","type":"post","link":"https:\/\/www.ligowave.com\/blog\/2015\/06\/ligoptp-5-n-pro-link-deployment-in-philippines\/","title":{"rendered":"LigoPTP 5-N PRO Link deployment in Philippines"},"content":{"rendered":"<p><a href=\"http:\/\/blog.ligowave.com\/wp-content\/uploads\/2015\/06\/map_77kmlink.png\"><img loading=\"lazy\" class=\"alignnone wp-image-144\" src=\"http:\/\/blog.ligowave.com\/wp-content\/uploads\/2015\/06\/map_77kmlink.png\" alt=\"map_77kmlink\" width=\"391\" height=\"188\" \/><\/a><\/p>\n<p>77 km over the water point-to-point link was installed using LigoPTP 5-N PRO devices with external dish antennas. The link connected Legaspi city with the municipality of Aroroy, Masbate in Philippines and the installation was done by a system integrator Double Square Networks Inc. Capacity of the backhaul link was expected to be 15 Mbps full \u2013 duplex, since the primary Internet bandwidth was only 10 Mbps.<\/p>\n<p><a href=\"http:\/\/blog.ligowave.com\/wp-content\/uploads\/2015\/06\/tower_ph.png\"><img loading=\"lazy\" class=\"alignnone wp-image-145\" src=\"http:\/\/blog.ligowave.com\/wp-content\/uploads\/2015\/06\/tower_ph.png\" alt=\"tower_ph\" width=\"464\" height=\"263\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>However, the actual results after the deployment and initial configuration reached 22 Mbps full duplex, which was 50% more than the required capacity.<br \/>\nFinally, system integrator was scheduled to improve results and attain the capacity of at least 35 Mbps full &#8211; duplex. However the final results were outstanding and reached 76 Mbps half &#8211; duplex.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>77 km over the water point-to-point link was installed using LigoPTP 5-N PRO devices with external dish antennas. The link connected Legaspi city with the municipality of Aroroy, Masbate in Philippines and the installation was done by a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":144,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/posts\/142"}],"collection":[{"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/comments?post=142"}],"version-history":[{"count":2,"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/posts\/142\/revisions"}],"predecessor-version":[{"id":146,"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/posts\/142\/revisions\/146"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/media\/144"}],"wp:attachment":[{"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/media?parent=142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/categories?post=142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ligowave.com\/blog\/wp-json\/wp\/v2\/tags?post=142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}